Minggu, 27 November 2011

My Weekly Gallery (3rd week of November)

Sunday, 13 November 2011

A herd of buffalo. I captured  on the way to my uncle's home.

Yeeee COW! I always be crazy in looking this kind of animal!!

Monday, 14 November 2011

Inside the car, on the way to crusher.

Inside the vibrating screen. That's grizzly.
Vibrating screen

On the tripper. It distributes the raw material from crusher into stockpile.

My field coach, Mr.Dwiyono, explained one of troubleshooting which is often taken by him.

Tuesday, 15 November 2011

Inside the employee's bus. It brought us to central control room and other areas.

It's our artificial forest. So green!!
One of mechanic of raw mill area were repairing the magnetic separator.

The belt conveyor was dropping limestone.

NG 1 and NG 2's area which had been dismantled and transformed into an artificial forest.

The labor was cutting the steel plate.


Wednesday, 16 November 2011

Aida and Ipung were looking for Instrument Workshop.


Aida and Ipung on the way to Electric Area.

A couple of pigeon. They made our plant closer to nature. Actually you could find many pigeon's cage inside the plant.

Our field coach, Mr.Agus, were explaining us about MCC.

Danger!!

It's enough for make us die immediately.

He showed us how does motor work.
Cycling inside the plant. Make us healthy.hehe

Thursday, 17 November 2011

This week we spent almost our time in electric and instrument area.

It distributed the power from PLN to certain areas.
Really high voltage.

Our field coach, Mr.Wahyu, was explaining everything about electricity.

We met our mate in the way of field trip. From left to right are Ipung, Ayunda, Aida, and Ajik.

Aida was recording everything which was said by our field coach.

The tools, complicated for us, but interesting for electrical and instrumentation engineer.

Friday, 18 November 2011

Wahyu and our assistant of GDP's coordinator, Mr.Iwan, similar but not identical.

Holcim Academy's preparation to welcome the visitation of CEO Holcim Group, Bernard Fontana.

Strategical steps in order to awake the leadership.

Along the way from Holcim Academy to Plant, Green is everywhere.

Our field coach showed us the power distribution.

PLN's facilities which distributed the power to our plant and other areas surround our plant.

The tower which distributes 75 kv.

We were keep on spirit in learning electricity in the heat of sun.

We are team!!!Ipung (UPN-Mining Eng), Aida (UNDIP-Chemical Eng), and me (ITS - Mechanical Eng)

The other team, Rina (UB-Mechanical Eng), Dede (ITS-Electrical Eng), and Fetra (ITS-Chemical Eng)

Aida and Ipung was cycling. We were happy!!
Lab.crew with us. From left to right : Nisa, Ria, Melisa, Aida, and Ipung.


Happy Weekend..:)
Keep Learning, Keep Growing!!

1 komentar:

  1. dahling..don't put too much photos in one single post. they call it bandwith killer hihi..sort of irritating for the one with limited internet connection..which later turns out they won't spend time to see every single photo..what a waste right? :) i guess 15-20 photos already exceed the limit :)

    BalasHapus